Roof safety railing for standing seam and Classic roofs

Roof safety railing for the standing seam profile and Classic profile from the Finnish manufacturer ORIMA – for standing seam and Classic metal roofs. The railing is fixed onto the profile seam with clamp brackets, so the roofing is not drilled and the roof stays watertight. Available 0.6 m and 1.1 m high, both heights also with a built-in snow guard.

ORIMA SYRL - 0.6 m roof safety railing with a snow guard on a galvanised standing seam roof

0.6 m railing with a snow guard (SYRL) on a galvanised standing seam roof.

Models

Model Height Snow guard Tubes per 3 m module
SYR 0,6 m no 2
SYRL 0,6 m yes 4
SYN 1,1 m no 3
SYNL 1,1 m yes 5

Technical data

Roofing standing seam profile, Classic profile
Height 0.6 m or 1.1 m
Fixing onto the seam with a bracket set, without drilling the roofing
Distance between posts 1080 mm
Module length 3 m (oval steel tubes)
Material hot-dip galvanised steel with powder coating
Colours colours of the TOODE RR colour chart, other colours to individual order
Screws M8, strength class 8.8
Manufacturer ORIMA (Finland), CE marking

Set contents (one 3 m module)

Part SYR SYRL SYN SYNL
Oval tube 3.0 m 2 4 3 5
Seam bracket set 4 4 4 4
Seam bracket 2 2 2 2
Diagonal brace 4 4 4 4
Vertical post 4 4 4 4
Screw M8×16 4 4 4 4
Screw M8×35 4 8 3 8
Screw M8×40 2 2 2 2
Nut M8 10 14 9 14
Self-drilling screw 4.8×20 12 12 16 16

Installation

  1. Position the posts

    The vertical posts with diagonal braces are placed along the edge of the roof at 1080 mm spacing.

  2. Fix onto the seam

    The bracket is placed on the seam and tightened with the screws until the tightening limit is reached – the edges of the bracket come together but do not deform or cut into the seam.

  3. Install the tubes

    The oval tubes are screwed to the posts with M8 screws and nuts (strength class 8.8). For a longer railing, the modules are joined one after another.

Installation instructions – under the “Documents” tab. TOODE supplies the railings; they are installed by a roofer.

With or without a snow guard

Models with the letter L at the end of the code (for example SYRL and SYNL) have two extra tubes at the bottom of the railing that act as a snow guard – they hold back snow and ice so it does not slide off the roof. This version is chosen if there is an entrance, path, terrace or parking space below the edge of the roof. Then no separate snow guard is needed there.

If you do not need a railing but do need a snow guard, choose snow guards for the standing seam profile or for Classic roofs. For moving safely on the roof – roof ladders and the roof walkway for the standing seam profile.

Colours and ordering

The railings are available in the colours of the TOODE RR colour chart, other colours to individual order. For a quote, give the roofing type, the length needed, the height (0.6 or 1.1 m), the colour and whether you need the version with a snow guard.

TOODE supplies the railings; they are installed by a roofer. Installation instructions for each model are under the “Documents” tab, and dimensioned drawings are sent on request.

Which railing suits your roof?

The railing structure is similar for all models – the difference is the fixing, which must be chosen according to the roofing.

Roofing Models How it is fixed
Standing seam profile and Classic SYR, SYRL, SYN, SYNL onto the seam, without drilling the roofing
Metal tile profile, corrugated asbestos-free sheets SYV, SYVL, SYO, SYOL to the battens through the roofing, with spacers and sealing washers
Trapezoidal and other profiled roofing SYT, SYTL, SYS, SYSL onto the roofing profile, screw points sealed with sealing tape
Soft (bitumen) roofing and metal tiles SYP, SYPL (0,6 m) posts with a base plate, screwed to the roof

No. The railing brackets are fixed onto the seam with screws, no holes are drilled in the roofing, so the roof stays watertight.

Yes, the SYR, SYRL, SYN and SYNL models are suitable for both standing seam and Classic profile roofs.

For a quote, give the length, height (0.6 or 1.1 m), colour and whether you need the version with a snow guard.

In the colours of the TOODE RR colour chart, and in other colours to individual order.

ORIMA installation instructions with an installation diagram and parts list. We will send dimensioned drawings on request – ask a TOODE consultant.

Installation instructions